xtremsavage
OG HPISF MEMBER!!!!!
- Messages
- 2,025
- Location
- Jacksonville, Fl
Stage 2 is 95% complete. I need to go to Lowes (or Home Depot) and get a deeper mud ring for the elec. box on the left side of the bench top. I thought I had everything measured out right and got a 1/2" mud ring but I now need a 5/8" mud ring. As you can tell from the pics, the whole inside of the top is pegboard. And the top section has 4 doors that I need to put back on.
Right side angle shot.
Left side angle shot.
Stage 3 will consist of adding a shelf at the very bottom of the bench. Still need to do some measuring to see how tall it needs to be. Stay tuned.
Right side angle shot.
Left side angle shot.
Stage 3 will consist of adding a shelf at the very bottom of the bench. Still need to do some measuring to see how tall it needs to be. Stay tuned.